Containerized integrated MBR sewage treatment equipment
+
  • Containerized integrated MBR sewage treatment equipment

Containerized integrated MBR sewage treatment equipment

Keywords:

Containerized integrated MBR sewage treatment equipment

China Landfill Leachate Treatment

Equipment Advantages

01.Excellent filtration effect and high membrane strength
• Average membrane pore size of 0.1μm, ensuring stable and reliable water production.
• High operating flux of 15-30LMH, requiring less membrane area for greater economic efficiency.
• Membrane filament tensile strength >200N, peel strength >3N, ensuring no breakage or peeling.
02.Small footprint and high degree of integration
• Each ton of water treated occupies only 0.2-0.4 m² of floor space, saving space.
• Each process unit is skid-mounted, creating an integrated design.
03.Simple process operation and convenient maintenance and management
• Daily maintenance and operation requires only regular sludge removal and chemical addition, simplifying maintenance and management.
• The equipment's covers, valves, and ladders are all lightweight, allowing one person to operate the entire system.
• The equipment does not require draining for up to two weeks after shutdown, and the system can resume normal operation within half a day of restart.
04.Good effluent quality and stable operation
• The sludge return system utilizes a multi-stage internal recirculation system, achieving a total recirculation rate of 300-400%, achieving excellent nitrogen and phosphorus removal.
• Applied in high-standard wastewater treatment scenarios, the equipment's effluent performance exceeds China's Class A emission standards.
• The equipment is highly automated and operates stably.

Process Flow
Product Parameters

Containerized integrated MBR sewage treatment equipment (Quasi IV Series)

Model

Processing water volume (T/D)

Specifications and dimensions (length, width, height, m)

Number of entities (units)

Inlet water index

Water outlet index

SY-SWM (IV) -50

50

6.0*2.8*2.8

1

COD≤350mg/L  
BOD≤200mg/L  
NH3-N≤35mg/L  
TP≤3mg/L  
SS≤220mg/L  
pH:6~9

Implement surface water environmental quality standards 
GB3838-2002 
COD≤30mg/L  
BOD≤6mg/L  
NH3-N≤5mg/L  
TP≤0.3mg/L  
pH:6~9

SY-SWM (IV)-100

100

9.5*3.0*3.0

1

SY-SWM (IV) -150

150

12.0*3.0*3.0

1

SY-SWM (IV)-200

200

14.5*3.0*3.0

1

SY-SWM (IV )-250

250

16.0*3.0*3.0

1

SY-SWM (IV)-300

300

11.5*3.0*3.0

1

SY-SWM (IV)-400

400

14.0*3.0*3.0

2

SY-SWM (IV)-500

500

16.0*3.0*3.0

2

 

Containerized integrated MBR sewage treatment equipment (First level A series)

Model

Processing water volume (T/D)

Specifications and dimensions (length, width, height, m)

Number of entities (units)

Inlet water index

Water outlet index

SY-SWM (Level A) -50

50

5.0*2.5*2.8

1

COD≤350mg/L  
BOD≤200mg/L  
NH3-N≤35mg/L  
TP≤3mg/L
TN≤40mg/L
SS≤220mg/L  
pH:6~9

Implement pollution control measures for urban sewage treatment plants
Emission Standard GB18918-2002 (Grade A Standard)
GB3838-2002 
COD≤50mg/L  
BOD≤10mg/L  
NH3-N≤5(8)mg/L  
TP≤0.5mg/L
TN≤15mg/L
SS≤10mg/L 
pH:6~9

SY-SWM (Level A) -100

100

7.0*3.0*3.0

1

SY-SWM (Level A) -150

150

9.5*3.0*3.0

1

SY-SWM (Level A) -200

200

12.0*3.0*3.0

1

SY-SWM (Level A) -250

250

14.5*3.0*3.0

1

SY-SWM (Level A) -300

300

16.0*3.0*3.0

1

SY-SWM (Level A) -400

400

11.5*3.0*3.0

2

SY-SWM (Level A) -500

500

14.0*3.0*3.0

2

Online Message

If you are interested in our products, please leave your email and we will contact you as soon as possible. Thank you!

Related Products

Related Case

Shuiyi Group‌ is a leading integrated water environment management service provider in China

Zhenjiang Water Environment Comprehensive Improvement Project

Zhenjiang Water Environment Comprehensive Improvement Project

Taicang Beijing Road South and Taiping Road West Pump Station Terminal Wastewater Treatment Project

Taicang Beijing Road South and Taiping Road West Pump Station Terminal Wastewater Treatment Project

Cixi Henghe In-Situ Ecological Water Replenishment Project

Cixi Henghe In-Situ Ecological Water Replenishment Project